Statistical Significance
Statistical significance says how incompatible the data are with a null model at a chosen threshold. It does not say how large or how important an effect is.
Statistical significance says how incompatible the data are with a null model at a chosen threshold. It does not say how large or how important an effect is.
An obvious outlier among ten values scores 2.8315, which is 99.5% of the maximum that sample size allows.
Do two groups convert at the same rate? The pooled z statistic, a worked A/B example with its interval, when to use Fisher’s exact test, and the A/B pitfalls.
A 12% lift at target power does not rule out detecting 2%. State the power, effect units, and design before judging whether the experiment is worthwhile.
Significance says a difference is detectable. Whether it is worth anything is a separate question that no test answers.
Ten thousand events from two thousand users is not n = 10,000 for a question about users. The unit you sampled decides what n is.
Power is the probability of rejecting the null when a specific alternative is true. Effect size, sample size, α, and variability set it, and it changes with the test design.
α is a tolerance you choose, not a measure of evidence. And the risk it trades against goes up as you push it down.
Divide by the standard deviation and you have an effect size. Divide by the standard error and you have a test statistic. They are not the same number.
A test rejects or fails to reject — it never confirms. And “fail to reject” covers both no effect and not enough data to tell.
The estimate is the gap between what happened and a forecast of what would have happened. Everything depends on that forecast being right.
The winning arm is the maximum of several noisy estimates, so its measured lift is biased upward by construction.
Testing several page elements in one experiment. What a factorial design buys, what it does not cost, and how the arm count multiplies the false positives.
Daily monitoring need not change inference. Stopping on a fixed-sample p-value does; valid sequential methods account for repeated looks and stopping.
Causal inference from observational data needs data and identifiability conditions. Choosing a method does not establish the identification assumptions.
A p-value is a probability about data given a model. Reading it as a probability about the hypothesis inverts the conditional.
Estimate minus null value, over a known standard error, against the normal curve. Exact for normal data with known sigma, else approximate; mostly proportions.
Estimate over its estimated standard error, referred to Student’s t. One-sample, paired, and two-sample forms, when to use Welch, and heavy tails.
“Unlikely due to chance” is the one reading a p-value cannot support. What it measures is incompatibility with a model, assumptions included.
Same distribution, no dependence between draws. The assumption behind the usual standard errors and intervals, and the one grouped or time-ordered data breaks.
Serial dependence changes the information in a time series. Positive and negative dependence can affect uncertainty in opposite directions.
Twenty categories over two hundred rows, independent by construction, average a V of 0.3077.
What applying an intervention costs per unit — including the margin given away to customers who needed no persuading.
The revenue a treatment caused rather than accompanied. Heavy-tailed, wide-intervalled, and not profit until a margin and a cost are applied.
How much more recovery an intervention produced than doing nothing — a rate, in percentage points, and not a quantity until a population is attached.
The units a campaign actually caused. Why counting them is not the same as counting revenue, and why a promotion can win on one and lose on the other.
Random assignment supports the plain treated-versus-control comparison; random ranking supplies an uplift baseline. Observational estimates need additional identification and adjustment assumptions.
Causal ML relaxes the shape of the model, not the assumptions that make a comparison causal. Those stay exactly as strong as before.
The incremental outcome accumulated as targeting goes deeper down an uplift ranking. Why it cannot be a sum over customers, and how to read where it flattens.
Count every student and the textbook formula still reports plus or minus 0.96 percentage points.
The extra outcome produced inside one slice of a ranking. Computed from response rates rather than counts, and not additive across slices when the treated share differs between them.
Everything a campaign produced that would not have happened anyway. Converting it to money, carrying its interval, and why treating everyone rarely wins.
The incremental outcome collected down to a depth of a ranking. Accumulating slice by slice gives a different answer from computing it directly.
Radcliffe’s incremental gains chart: treated responders minus what an equal treated group would have produced untreated. Its baselines, and why they matter.
The per-unit output of an uplift model: a difference of two predicted probabilities, not a probability. What it supports, and what it cannot be checked against.
Uplift models estimate conditional treatment effects. Targeting also needs outcome values, action costs, constraints, and uncertainty.
Customer demand never changed. Four stages later the factory plans against a signal 43.8 times as volatile.
Prophet offers configurable forecasting at scale. Two FPP3 examples favor other methods on accuracy; assess its performance on your own series and forecast horizon.
The d in ARIMA(p,d,q) decides the shape of your long-horizon uncertainty. With d = 0 intervals converge; with d ≥ 1 they keep growing.
Plus 10%, minus 10%, twice: the arithmetic mean is zero and 98.01% of the money is left.
VaR is a quantile of a loss distribution. It marks where the tail starts and is silent about what happens beyond that point.
“How likely is demand above capacity?” is a question about a region of the distribution. A point forecast has no way to answer it.
Three forecasters saying 0.70, 0.80 and 0.99 are correct on exactly the same 70% of days.
No finite set of quantiles determines a mean. A mean is an integral over the whole line.
Fit a Normal to data from a t and the probability of a loss beyond 5% comes out 0.001653 against a truth of 0.005862.
Asymmetric costs have an asymmetric answer. If being short costs three times as much as being long, the target is not the mean.
A point forecast is one summary of a distribution. Reporting only the summary discards the part a decision usually needs.
Days it calls 0.0152 happen 23.81% of the time, and accuracy ranks it level with the truth.
The same heights give f = 0.039894 per cm and 3.989423 per meter. The interval probability is 0.682689 either way.
Most forecast intervals assume normality, and the assumption is least reliable exactly in the tails — which is where risk questions live.