RMSLE (Root Mean Squared Logarithmic Error)
A doubled forecast contributes 0.480384 or 0.164402 to MSLE at actuals 10,000 and 1. RMSLE takes the square root of the mean contribution.
A doubled forecast contributes 0.480384 or 0.164402 to MSLE at actuals 10,000 and 1. RMSLE takes the square root of the mean contribution.