ITSM and SRE Change Management
A change advisory board and an error budget can both be working correctly and still disagree about whether today was a good day.
A change advisory board and an error budget can both be working correctly and still disagree about whether today was a good day.
Nobody wants backups; they want restores. And the costliest topology still needs them, because running everywhere means the corruption runs everywhere.
Capacity planning connects demand, service targets, and failure tolerance. Test usable capacity and spare headroom before turning a forecast into clusters.
Without it, the decision about what to drop is made during the incident by whichever component hits its threshold first.
Requests per second cannot tell you how full you are. And no amount of capacity planning removes the need to decide what gets dropped first.
Plan scheduled coverage separately from incident work. Explicit escalation, acknowledged handoffs and capacity for follow-up keep the rotation sustainable.
To users, a postmortem without subsequent action is indistinguishable from no postmortem. Five action-plan failure modes show what to check after the document is written.
Adapted from the Incident Command System developed for firefighting in the 1970s. Its point is that somebody must be coordinating while others fix as soon as they are available, and everyone must know who that is.
Mitigate without waiting for a complete causal explanation, then verify recovery and follow-through. Explicit command and sustainable coverage support both.
Urgent interruptions consume limited attention. Assess paging load with staffing, shift length, incident complexity, and observed response needs.
You can receive 144 alerts a day, act on none of them, and still meet your reliability target. That is a measurement problem, not a discipline problem.
Choose reliability targets with product owners and engineers. Compare failure impact and concrete design costs, then revisit the commitment as needs change.
Calculate the allowed failures, then agree what to do when the allowance runs low. Measurement, release restrictions, and recovery are separate decisions.
A reliability target needs a measurement boundary, a reason, and a response to failure. Learn how SLIs, SLOs, and error budgets support that decision.
Classify recurring work by its purpose, repetition and lasting result. Judgment can still be toil when redesign could remove the repeated decision.
Define who operates platform capabilities, how support is shared, and how agreed limits and exceptions protect engineering capacity.