Pilot Exit Criteria
Pilot exit criteria are the evidence and decision rules agreed before a bounded trial begins: what would justify advancing to a defined next stage, stopping or pausing the attempt, or funding another test. They include scope, measures, cost limits, ownership, and a review date. Prioritize the riskiest assumption or assumptions the next decision depends on. The UK Service Manual treats alpha as a period for testing ideas and assumptions, followed by a decision about beta or other next steps. Beta approval is not unrestricted production approval; duration and evidence must fit the question being tested.
Make the next decision explicit
Advance when the evidence and resources support the next approved scope, including required permissions, safety controls, operating capacity, and support. An offline study can advance to an integration experiment before continuous delivery exists.
Stop or pause when constraints, negative evidence, or low expected learning value no longer justify the attempt. A flat estimate does not by itself prove no useful effect: check precision, delayed outcomes, and measurement quality.
Test again only when a specific evidence gap can be reduced at worthwhile cost, with a budget and review date. The same hypothesis can justify a larger sample; inventing a new hypothesis is not mandatory. Missing evidence does not automatically justify extension. These decisions concern the current attempt and need not permanently discard the underlying need.
For live expansion, assess representative users and inputs, harmful errors, reviewer performance, permissions, load, and recovery. Override rates are investigation signals, not proof that the system is safe or correct.
A fictional bank has fourteen pilots with no production service. Its classifier first tests classification on a lawful snapshot, then tests repeatable delivery and a limited regional workflow. In parallel operation, only one process routes each letter; the other supplies shadow results. Expansion requires approval for the wider scope and explicit transition and rollback criteria. Readiness is specific to that step, and an evidence gap calls for a decision about further learning, not automatic continuation. For reporting, count unique use cases separately from repeat rounds. If two approval cohorts of fourteen and nine use cases receive the same eighteen-month follow-up, 0/14 and 5/9 in production describe their conversion, while stopped and pending cases must also be reported. Use rounds whose deadlines have arrived to measure on-time exit decisions. Pair these counts with costs, learning, control performance, and service outcomes; a higher conversion rate alone does not establish value or causation. Fourteen Pilots and Nothing in Production develops the strategy example.
References:
- GOV.UK Service Manual, How the alpha phase works (Open Government Licence v3.0).
- GOV.UK Service Manual, How the beta phase works (Open Government Licence v3.0).