Measuring AI Productivity: Activity vs. Value
A fictional payments-software company with 600 engineers rolled out an AI coding assistant eight months ago, and the renewal decision is due. The usage dashboard looks strong. Last week 468 engineers, or 78 percent, accepted at least one suggestion. The 210 engineers who use the assistant regularly (on at least three days a week) merge 45 percent more changes per week than everyone else. In the quarterly survey, 72 percent say they feel faster. The vice president of platform engineering must tell the CFO whether to renew all 600 seats. In the same meeting, the release manager mentions that review queues have grown and that more merged changes are coming back for fixes. Nobody in the room can say whether those facts cancel the dashboard or have nothing to do with it. The company and every figure in this case are invented.
Each dashboard number can be accurate and still fail to answer the CFO’s question, because each one measures something that sits upstream of value. The previous post, Leading AI-Assisted Engineering Adoption, described how such a company stages a rollout and why review capacity decides where the extra output goes. The question now is how to know, in numbers, whether the rollout paid off.
Four levels, and the numbers that belong to each
It helps to sort every AI productivity number by the level at which it is measured. At the use level, the question is whether people touch the tool: active users, accepted suggestions, sessions. At the task level, the question is whether a specific piece of work, such as drafting a function or writing a test, gets done faster or better. At the workflow level, the question is whether the whole path from request to working software changes, including review, rework, waiting, and incidents. At the business level, the question is whether the company gets something it values, such as commitments met, cost avoided, or fewer customer-facing failures, and who ends up holding the gain. A measurement at one level is evidence about the next level only if someone has checked the link between them. A count of merged changes, an adoption percentage, and a survey of how fast people feel are each a proxy metric: a stand-in whose connection to the outcome is an assumption to test.
Published research shows how far apart the levels can sit, and how measurement itself goes wrong. In METR’s 2025 randomized trial, experienced developers working on repositories they knew well predicted a 24 percent speedup, were measured 19 percent slower with AI allowed, and afterward still believed AI had sped them up by about 20 percent. A feeling of speed and a stopwatch disagreed, which is a direct reason not to let the survey carry the renewal decision. METR’s follow-up study, begun in August 2025, estimated task times 18 percent shorter for returning developers and 4 percent shorter for new recruits, but the confidence intervals ran from 38 percent shorter to 9 percent longer, and from 15 percent shorter to 9 percent longer. METR also reported that 30 to 50 percent of developers said they held back tasks they did not want to do without AI. That behavior removes the tasks where the tool helps most from the comparison, and METR concluded that its data were very weak evidence for how large the speedup now is. The authors of the first study stated that it did not show AI fails to help most developers, and METR now marks it as out of date.
Other settings produce other answers. In a study of 5,179 customer support agents who received an AI assistant in a staggered rollout, Brynjolfsson, Li, and Raymond found a 14 percent average increase in issues resolved per hour, 34 percent for novice and low-skilled workers, and minimal effect for experienced and highly skilled ones. DORA’s 2025 research associates higher AI adoption with higher software delivery throughput and, in the same data, higher delivery instability. The studies differ in task, population, tool generation, and outcome, so none of them transfers to the payments company automatically. They share a structure: whether the tool helps depends on who uses it, for which work, and at which level the result is read. The company has to measure that for itself.
Baselines at the task level and the workflow level
A baseline is a reference measured before the change, with the same definitions as the later measurement: which work is included, when the clock starts and stops, and who is counted. A manager’s recollection of how long things used to take is an assumption, not a baseline. The payments company had ten weeks of pre-rollout data, collected from its source-control and ticket systems and from a time-sampling exercise in which engineers logged hours against the stages of a change. The following figures describe the teams that now use the assistant regularly, as hours per merged change summed across everyone who touched it. All of them are hypothetical.
| Stage of a merged change | Before (hours) | After (hours) | Who spends the time |
|---|---|---|---|
| Authoring, from first edit to opened change | 6.00 | 4.20 | Author |
| Review | 1.50 | 1.60 | Reviewer |
| Revisions after review comments | 1.00 | 1.30 | Author |
| Expected follow-up fixes (30-day fix rate ร 6 hours per fix) | 0.48 (8% ร 6) | 0.66 (11% ร 6) | Owning team |
| Total | 8.98 | 7.76 |
At the task level, authoring time fell by 1.8 hours, a 30 percent reduction, and a task-level study would report exactly that. At the workflow level, total effort per change fell by 1.22 hours, or 13.6 percent. The difference is the cost that moved: reviewers spent more time, authors spent more time answering review comments, and a larger share of changes came back for a fix. None of those costs shows up in a count of suggestions accepted.
The table also supports a consistency check that leaders can apply to any productivity claim. These teams merged 3.4 changes per engineer-week before and 4.2 after. Multiplying output by effort per change gives the hours the work consumed: 3.4 ร 8.98 = 30.5 hours per engineer-week before, and 4.2 ร 7.76 = 32.6 after. Hours spent on changes rose about 7 percent. Output grew faster than effort per change fell, so part of the extra output came from engineers devoting more of their week to changes. Something else, such as design time, mentoring, or support, gave way. A productivity claim that does not say where the time came from is incomplete.
The review column deserves attention because waiting grows faster than workload. Take a team of nine engineers whose reviewers can supply about 64 review hours per week. Before the rollout the team merged 30.6 changes a week at 1.5 review hours each, which is 45.9 hours, or 72 percent of reviewer capacity. After it, the team merged 37.8 changes at 1.6 hours each, which is 60.5 hours, or 94.5 percent. Under the simple queueing model used in the previous post, the average wait for a first review rises from about 3.8 hours to about 27.5 hours, roughly seven times longer, although review workload grew by only 32 percent. This is why DORA’s delivery metrics, which watch lead time and instability across the delivery system, belong beside any task-level measure, and why productivity metrics that cover several dimensions of work are safer than a single output count. Change lead time in DORA’s definition starts at the commit, so time spent waiting for specification or approval before anyone wrote code is outside it.
Rework, defects, and what adoption means
Adoption figures need denominators that match the question. The dashboard’s 78 percent counts engineers who accepted at least one suggestion in the week, out of all 600. Regular users, defined as those active on three or more days, number 210, or 35 percent. Both are true, and they describe different things: reach and depth. The cost of the license is paid on 600 seats, but the effect measured in this case comes from 210 engineers, and the other 390 supply the comparison group. Reporting adoption by team and by task type shows whether the tool is used where it can matter, and Live for a Year, Used by a Third shows how to define an adoption measure with eligible units and a completion event.
Rework needs its own definition. Here a merged change counts as reworked if a fix, revert, or follow-up change to the same code is needed within 30 days. This is narrower than the idea of rework in general, and it differs from the deployment rework rate in DORA’s five metrics, which counts unplanned deployments caused by production incidents. Both are useful, and they answer different questions. Among the regular-use teams the 30-day rework rate rose from 8 percent to 11 percent, while in the comparison teams it stayed at 9 percent. A rate that moves in one group and not the other is a signal to find the cause: larger changes, thinner review, or automation bias, in which a reviewer who has seen many correct suggestions stops examining the next one. Sampling a set of reviews and recording what the reviewer actually checked can separate those explanations. Rework is a guardrail in the sense of primary and guardrail metrics: it has to stay within an agreed limit while the primary measure improves, and it must be defined before the results arrive.
Attribution adds a difficulty. Tool telemetry records suggestions accepted. It does not record how much of a merged change survived editing, or whether a defect came from generated code or from a rushed deadline. Comparing changes labeled AI-assisted with the rest compares different kinds of work, since people reach for the tool on particular tasks. A safer unit of comparison is the team or the engineer over time, with the exposure defined by who had access, and with quality read from outcomes such as follow-up fixes and incidents that do not depend on anyone labeling the code.
The dashboard’s headline, 45 percent more changes among regular users, can now be tested. The following figures are merged changes per engineer-week for the 210 regular-use engineers and for the comparison group of 390. Regular users merged 3.4 before and 4.2 after. The others merged 2.6 before and 2.9 after.
| Reading of the same data | What it compares | Estimated gain | Engineer equivalents among the 210 |
|---|---|---|---|
| Dashboard gap | Regular users after (4.2) with others after (2.9) | +44.8% | 94.1 |
| Before and after | Regular users after (4.2) with the same engineers before (3.4) | +23.5% | 49.4 |
| Difference-in-differences | Their gain (+0.8) minus the others’ gain (+0.3) | +0.5 changes, +14.7% | 30.9 |
| Same, counting only changes with no 30-day fix | Clean changes: 3.128 to 3.738 for regular users, 2.366 to 2.639 for others | +0.337 changes, +10.8% | 22.6 |
Each row removes one source of error. The dashboard gap includes a difference that existed before the tool: regular users already merged 31 percent more changes than the others (3.4 against 2.6). The before-and-after gain includes a drift that lifted everyone: the comparison group’s merges rose by 11.5 percent over the same months, with no tool involved. Difference-in-differences subtracts the comparison group’s change from the regular users’ change, which removes both the permanent gap and the shared drift. It depends on an assumption that cannot be observed, that without the tool the two groups would have moved in parallel. If the engineers who adopted the assistant were also the ones already on an improving path, even this estimate is too high. The last row recounts output after setting aside changes that needed a fix within 30 days, so that speed bought with defects is not credited. The 45 percent headline and the 10.8 percent adjusted figure describe the same engineers in the same months.
What an experiment can and cannot settle
The strongest answer to selection and drift is random assignment, and the company can use some of it. The mechanics of cohort design, intention to treat, and power are worked through in Measuring an AI Development Tool Rollout. A leader needs to know why a clean experiment is hard in software and what remains uncertain even after one.
Assignment has to happen at the team level when engineers share a review queue and a codebase. If one engineer in a team gets the tool and merges more changes, a teammate’s review load changes, and the comparison between the two engineers is contaminated. Assigning teams leaves few units. Suppose the company can randomize 20 teams to each arm and that the team-level change in merged changes per engineer-week has a standard deviation of 0.45 (a hypothetical figure). The smallest effect such a comparison detects with 80 percent power at the usual 5 percent significance level is about (1.96 + 0.84) ร 0.45 ร โ(2/20) โ 0.40 changes per engineer-week, about 12 percent of the 3.4 baseline. That is the size of the adjusted estimate in the table. A clean trial of this size could easily fail to confirm a gain that is real and still worth having, and a result that is not statistically significant would not show that the gain was absent. The statistical power entry explains why power must be quoted against a named effect size.
A staggered rollout with a randomized order fits an enterprise better than a permanent holdout. Every team receives the tool eventually, and teams not yet reached serve as comparisons in the meantime. The customer-support study used a staggered introduction. A permanent control group tends to run out of patience: people ask for the tool, and the comparison erodes. Randomizing the order also protects against the case where the most enthusiastic, and perhaps already improving, teams go first.
Other limits do not go away with randomization. Developers who refuse to work without the tool distort a design that asks them to; METR’s follow-up study shows how participation itself can change what is measured. Time spent is hard to record when engineers run an agent in the background and work on something else, so hours logged may not mean attention spent. The tool changes every few months, so an estimate has a shelf life, and a model or workflow change calls for a fresh baseline. Finally, some effects are outside any quarter-long experiment: whether engineers early in their careers build the judgment to review what the tool produces, whether the code stays maintainable, and whether teams change how they decompose work. These need guardrails and periodic sampling rather than a test with a significance threshold.
From measured effect to business value, and who holds it
The last column of the table converts a percentage into engineer equivalents: the extra output of the 210 regular users expressed as the number of additional engineers it would take, at the old rate, to produce it. Pricing that requires hypothetical inputs. Assume a fully loaded cost of \$200,000 per engineer-year and \$1,500 per seat-year for the assistant, so 600 seats cost \$900,000. The dashboard reading, 94.1 equivalents, is worth \$18.8 million a year. The adjusted reading, 22.6 equivalents, is worth \$4.5 million a year, about five times the license cost. The adjusted figure is less than a quarter of the dashboard’s, but the tool still pays for itself at these prices. A rule that rewards the largest number would have asked for expansion. The honest number supports a more specific decision.
Even \$4.5 million is a value of capacity, not a value in the budget. As benefits realization distinguishes, released capacity becomes a financial benefit only when the company uses it, whether for work on the backlog that the business wanted, hiring avoided, or contractor spend reduced. Here headcount is unchanged, so the benefit shows up only as output, and output is worth something only if the changes carry value. Merged changes are not equal in size or importance, and a count says nothing about whether the right ones shipped. The business-level test is whether commitments were met sooner, whether customer-facing failures fell, and whether the roadmap items that mattered moved, and that evidence has to be collected separately from engineering counts.
Gains are also not shared evenly, and that affects whether they last. In the workflow table, authors save 1.8 hours of drafting and spend 0.3 hours more on revisions, a net saving of 1.5 hours per change. Reviewers spend 0.1 hours more per change, and the owning team spends 0.18 hours more per change on follow-up fixes. The reviewer’s load is also the one that grows nonlinearly, from 72 percent to 94.5 percent utilization in the nine-person team above. If review capacity sits mostly with senior engineers, the company has moved effort from the people whose output the dashboard counts to the people whose time it constrains. The distribution also varies by who uses the tool. The customer-support evidence showed larger gains for novices, while METR’s 2025 trial found experienced developers on familiar repositories slower with the tool. Segmenting results by experience and by type of task keeps an average from hiding groups for whom the effect is negative. Gains can also flow outside engineering: faster delivery may benefit customers or the product organization, while the engineers who absorbed rework and review see only more work. An incentive system that pays for change counts will teach people to split and generate changes, the usual failure of a proxy once it becomes a target.
The vice president’s answer to the CFO can now be specific. Renew for the 210 regular users and for teams whose review capacity can absorb the added load, and treat the other seats as a staged rollout instead of a flat renewal. Fund review capacity or reduce change size before extending, because the queue, not the authoring step, limits the workflow. Roll the tool out to the remaining teams in a randomized order across the next two quarters. Set thresholds in advance, for example pausing a team’s expansion if its 30-day rework rate stays above 12 percent for two consecutive months, a limit the company chooses for itself. Report the four readings in the table each quarter instead of the dashboard gap, and re-establish baselines whenever the tool, the model, or the review process changes materially. That is a smaller claim than “45 percent more output,” and it is one the company can defend when someone asks for the evidence.
References
- METR, Measuring the Impact of Early-2025 AI on Experienced Open-Source Developer Productivity, July 2025.
- METR, We are Changing our Developer Productivity Experiment Design, February 2026.
- Erik Brynjolfsson, Danielle Li, and Lindsey Raymond, Generative AI at Work, NBER Working Paper 31161.
- DORA, Balancing AI tensions: Moving from AI adoption to effective SDLC use, 2025 research.
- DORA, State of AI-assisted Software Development 2025.
- DORA, Impact of Generative AI in Software Development, 2024 research on adoption, batch size, and stability.
- DORA, DORA’s software delivery performance metrics.
Discover more from Insightful Data Lab
Subscribe to get the latest posts sent to your email.
