Quantile Forecasts
Asymmetric costs have an asymmetric answer. If being short costs three times as much as being long, the target is not the mean.
Asymmetric costs have an asymmetric answer. If being short costs three times as much as being long, the target is not the mean.
A point forecast is one summary of a distribution. Reporting only the summary discards the part a decision usually needs.
Most forecast intervals assume normality, and the assumption is least reliable exactly in the tails — which is where risk questions live.
A point forecast is one summary of this. Once you keep the whole distribution, the decision can pick the summary it actually needs.
Reported without an interval, a forecast carries no way of telling how accurate it is — which is why a single line reads as certainty.
Interval width depends on the model and horizon. Coverage reflects the uncertainty represented in the model, not every possible change in the world.
Swap squared error for an asymmetric loss and the fitted line becomes a quantile. Three fits give you an interval with no normality assumption.